Go gauge for caps on finished lamps E17, 7006-27K-1

Include ISO 17025 CNAS & ILAC Test Report
Item No.: 7006-27K-1
Made in China
Product description: Go gauge for caps on finished lamps E17, 7006-27K-1.

Go gauge for caps on finished lamps E17, 7006-27K-1 


Purpose: 

To check the maximum dimensions of the screw thread and dimension T1 minimum of E17 caps on finished lamps. 


Testing: 

When the cap on a finished lamp has been screwed into the gauge as far as it will go, the centre contact shall touch surface X. When the lamp is being removed from the gauge, at least two full turns shall be required to disengage the threads.


7006-27K-1.jpg

iecgauges详情_01.jpgiecgauges详情_02.jpgiecgauges详情_03.jpgiecgauges详情_04.jpgiecgauges详情_05.jpgiecgauges详情_06.jpgiecgauges详情_07.jpgiecgauges详情_08.jpgiecgauges详情_09.jpg


INQUIRY

Scan the qr codeclose
the qr code
TAGS Test Probe BTest Probe 18Test Probe 11Go GaugesIEC 61032IEC 60335Test PinTest FingerIEC 60061-3Wedge Probe7006-29L-47006-27D-37006-11-87006-51-27006-51A-2 7006-50-17006-27C-17006-28A-1Test Probe7006-27B-1IEC 61010IEC 60529IEC 60068-2-75